Published:2021-08-31
The newly-built bridge is located between Tongjiang City in Heilongjiang Province, China and the Nizhneleninskoye City in Russia. The total length of the bridge is 7,194m, including an approach bridge of 4,979m and a main bridge of 2,215m (1,886m in China and 329m in Russia). The design operation speed is 100km/h, and the annual freight capacity is 21 million tons. The construction of the bridge started in February 2014, the main works of the China section were completed in October 2018, and all acceptance procedures such as static acceptance, dynamic acceptance, preliminary acceptance and safety assessment were completed in July 2019.